BIM projects

Tools and processes are the foundation of our work. Within this philosophy, we use the BIM methodology as a strategy for integration and innovation, which allows us to conceptualize projects with greater assertiveness and productivity.

pillars of development in BIM projects

1. Innovation: market resources in innovation are our guidelines for optimizing productivity and increasing quality in project management. We work in an integrated manner, guaranteeing the most complete level of information at all stages.

2. Processes: BIM projects are organized in development schedules – mandatory documents that define the workflow, scope of responsibilities, project stage and management of the partners involved.

3. People: the main factor responsible for the successful execution of BIM projects are the people. That’s why our team is made up of multidisciplinary and highly trained professionals, with a mindset prepared to absorb the hard skills of BIM methodology and modeling. We value training workshops and exchanges for better performance and interaction.

BIM modeling: gains throughout the building cycle

The benefits provided by BIM modeling encompass all those involved in the architecture and engineering disciplines and allow for significant gains such as reducing errors, extracting accurate data information and, consequently, greater productivity when compared to 2D processes.
Modeling in BIM software, when well planned, allows for gains in the creation and design, visualization, analysis and sharing of data throughout the building’s life cycle.

In addition, the 3D virtual model enables multidisciplinary coordination in a single environment, making it easier to detect problems and conflicts.
Collaborative BIM design anticipates problems identified during the construction phase, mitigating errors and minimizing rework and extra costs for final execution.